Our team at Smart Hire can deliver directly to you
Smart Hire’s trade-quality electric-powered concrete mixer is ideal for small construction and building projects, producing bricklaying mortar, small concrete batches and cement rendering. This 240V electric mixer can be utilised as both a mixer and wheelbarrow, as its sturdy rear wheels allow it to be carted around easily.
Applications:
Dimensions: | On-stand: | Off-stand: |
Height: | 1432mm | 890mm |
Width: | 1057mm | 597mm |
Length: | 1227mm | 1211mm |
Unladen Weight: | 55kg | |
Max Mixing Capacity: | 60L (0.06 CM) | |
Power Required: | 240V |
Yes! Smart Hire has a wide range of site & general hire equipment, going from builders toilets, temporary fencing & rubbish cages, to excavators, bobcats and scissor lifts.
Full Day: $50
Week: $140
Weekend Special: $50 (weekend only)
1. How much does it cost to rent a concrete mixer ?
The cost of rental/hire of a concrete mixer in Australia ranges between $45- $90 over a 24 hour hire period, these price differences depend on machinery quality, size and the rental service.
2. How much does it cost to get concrete ?
The price of professionally obtaining concrete ranges between $240 at a minimum, to theoretically millions of dollars dependent on the job size. Minimum qualities are generally 0.4 cubic metres, and prices for pathways will range between $60-$150 per square metre for plain, decorative or exposed aggregate concrete.
3. How long does it take to mix concrete ?
In a concrete mixer the components should be fully combined into a uniform consistency within 3-4 minutes of turning on the machine.
4. What is the correct mix for concrete ?
For general use concrete with no specific applications, the best heuristic is to use mixer of 1 part concrete : 2 parts sand : 3 parts gravel by volume (e.g 1kg of concrete with 2kg sand and 3kg gravel) then mixing it with water to obtain your desired consistency.
5. How long does concrete take to set ?
Concrete can take anywhere between 10min- 24 hours to fully set (depending on the type), however it will around 7 days to reach 70% strength and up to 1 month to cure to its full strength.
For any inquiries or to organise a hire please contact our friendly staff today! Standard delivery is with a crane truck.
Please discuss if any special delivery or positioning is required as we are able to provide additional staff and equipment in most cases.
© 2024 Bendigo Smart Hire | Sitemap